Product Details:
Payment & Shipping Terms:
|
Condition: | New | Name: | Boiler Super Heater |
---|---|---|---|
Usage: | Industry/Power Station | Structure: | Fire/Water Tube |
Pressure: | High/Low Pressure | Output: | Hot Water/Steam |
Dimension(L*W*H): | Customization | Weight: | 10~1000ton |
Product Name: | Floor Standing Radiant Superheater In Power Plant , Superheater Tubes | Keywords: | Boiler Superheater |
Application: | Power Plant Boiler | ||
High Light: | convective superheater,superheater tubes |
Floor Standing Radiant Superheater In Power Plant , Boiler Super Heater
Description
The Steam Superheater is a coil type heat exchanger which is used to produce superheated steam or to convert the wet steam to dry steam, generated by a boiler. It is different from a boiler in a way that, boiler utilizes both sensible heat as well as latent heat to convert water into steam while superheater utilizes only sensible heat to superheat the steam in order to increase its enthalpy.
Specifications
Description | Superheater |
Material | Alloy steel, Carbon steel etc. |
Material standard | ASTM, EN or ISO etc. |
Structure Type | Tube Coil |
Dimension | Customization |
Supply ability | 500 ton per month |
Manufacturing process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Bending tube→Assembly→Inspection →RT→Heat treatment (annealing)→Hydraulic pressure test→Painting→ Packaging |
Thermal Efficiency | Around 95% |
Boiler Parts
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube
Name&Type | Supply Ability: | FOB Price |
Boiler drum | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler header | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler waterwall panel | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler economizer | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler super heater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Boiler air preheater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Other | 300Ton/Tons per Month | Contact Me Get Latest Price |
FAQ
1. Why choose us?
We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.
We ensure the deliver time, high quality, and the best after-sale service for you.
2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.
ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: info@orlpower.com
Website: http://www.orlpower.com
Contact Person: Mr. Allen Liu
Tel: 18550138377
Fax: 86-512-56761658