Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Suzhou orl power engineering co ., ltd
Home ProductsBoiler Mud Drum

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard

China Suzhou orl power engineering co ., ltd certification
China Suzhou orl power engineering co ., ltd certification
It's really a great idea to make cooperation with you.

—— Vipin Bhardwaj

save money and time ,Excellent quality ,prefect service ,Enthusiastic and creative team.Great!

—— Yavorovich Nikolay

Unique creativity, a strong design team, new products, new surprises, every order can bring a lot of profit.

—— Ghaleb Jaber

I'm Online Chat Now

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard
30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard
video play

Large Image :  30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard

Product Details:
Place of Origin: Zhangjiagang,Jiangsu,China
Brand Name: ORL Power
Certification: ISO9001/SGS/TUV/ASME/EN
Model Number: Customization
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set/Sets 10tons
Price: Contact me | Get Latest Price
Packaging Details: Iron Frame Package
Delivery Time: 50~100 Days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 100Ton/Tons per Month
Detailed Product Description
Condition: New Type: Natural Circulation/Once Through
Usage: Industry/Power Station Structure: Fire/Water Tube
Pressure: High/Low Pressure Style: Style
Fuel: Coal/Gas/Oil-fired, Water Heat Output: Hot Water/Steam
Dimension(L*W*H): Customization Weight: 10~1000ton
Product Name: 30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard Keywords: Boiler Drum
Color: Customization
High Light:

boiler drum

,

high pressure drum

 

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard

 

 

Website:www.orlpower.com

 

Boiler Mud Drum

 

Description

 

In the water tube boiler the upper drum (Boiler steam drum) provides for separation of steam from water. It also provides liquid holdup capacity (typically 10 to 60 seconds) to allow for a dynamic response to load changes without losing liquid in the downcomer and riser tubes. The size of the steam drum is determined by the volume required for a clean separation between steam and water to produce a dry saturated steam, it also provides an adequate amount of steam storage. The steam drum is also called the upper drum.

 

Product parameter

 

Product Name Boiler Steam Drum ( Steam Water Separator )
Applied Area Natural circulation boiler
Drum Shell Plate Material

- Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70

- Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353

Drum Head Material Same as shell
Nozzle Tube Material As per design
Standard China GB, ASME, EN
Manufacturer Grade China A Grade, ABS Certificated, TUV Certificated
Working Temperature Saturation Temperature at rated pressure
Working Pressure 1.6 MPa ~ 22.5 MPa

Shell Plate Thickness

(Drum Wall Thickness)

≤150 mm
Drum Diameter ≤3,200 mm
Drum Length ≤25,000 mm
Welding

- Shell : SMAW, SAW

- Nozzle tube : GTAW (TIG), SMAW

Welding NDT

- Shell longitudinal seam : 100% RT, 100% UT

- Shell circumferential seam : 100% RT, 15% UT

- Nozzle tube angle seam : 100% UT, 100% MT

 

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater

 

 

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month

Contact Me Get Latest Price

 

 

Boiler Parts

 

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 0

 

Company Information

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 1

 

 

Product Description

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 2

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 3

 

Production Workshop

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 4

 

Boiler Product Production

Boiler Cyclone Separator WorkShop, Boiler Coil Workshop, Boiler Waterwall Workshop.

 

Testing Center

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 5

Boiler Product Test

 

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

 

Packaging & Shipping

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 6

 

Certifications

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 7

 

Company Business

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 8

 

Our products have been wildly used in power plants and large international companies overseas.

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 9

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

 

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

 

Trading Process

 

30 Ton Power Station Boiler Mud Drum Sterilization ORL Power SGS Standard 10

 

ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.

 

FAQ

 

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

 

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

 

Contact Information

  • ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
  • Phone:+86 0512-56770166
  • E-mail: info@orlpower.com
  • Website: www.boiler-units.com 

 

Contact Details
Suzhou orl power engineering co ., ltd

Contact Person: Mr Robin

Tel: +8618550138377

Send your inquiry directly to us (0 / 3000)