Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsCFB Boiler Economizer

Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

Good quality Boiler Water Wall for sales
Good quality Boiler Water Wall for sales
It's really a great idea to make cooperation with you.

—— Vipin Bhardwaj

save money and time ,Excellent quality ,prefect service ,Enthusiastic and creative team.Great!

—— Yavorovich Nikolay

Unique creativity, a strong design team, new products, new surprises, every order can bring a lot of profit.

—— Ghaleb Jaber

I'm Online Chat Now

Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

China Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry supplier
Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry supplier Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry supplier

Large Image :  Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

Product Details:

Place of Origin: Zhangjiagang,Jiangsu,China
Brand Name: ORL Power
Certification: ISO9001/SGS/TUV/ASME/EN
Model Number: Customization

Payment & Shipping Terms:

Minimum Order Quantity: 1 Set/Sets 10tons
Price: Contact me | Get Latest Price
Packaging Details: Iron Frame Package
Delivery Time: 50~100 Days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 500Ton/Tons per Month
Contact Now
Detailed Product Description
Condition: New Product Name:: China Supplier Cfb Boiler Modernization Economizer Finned Tubes
Usage: Industry/Power Station Certificate: ISO9001
Pressure: High/Low Pressure Style: Style
Fuel: Coal/Gas/Oil-fired, Water Heat Output: Hot Water/Steam
Dimension(L*W*H): Customization Weight: 10~1000ton
Keywords: Economizer Silver Boiler Product Name: Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

Power Plant CFB Boiler Silver Boiler Spare Part Boiler Petroleum Industry Heat Boiler Economizer TUV

 

 

 

Quality Control:
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety

 

 

CFB Boiler Economizer

 

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month Contact Me Get Latest Price

 

Boiler Product Production

Boiler Cyclone Separator WorkShop, Boiler Coil Workshop, Boiler Waterwall Workshop.

 

Applications:

The main petroleum industry heat boiler economizer is Widely used for power plant, power station, etc.

 

Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

Certifications

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

 

Commerce Terms:

Minimum Order Quantity: 1 Piece
Price: US $10000 - 50000 / Set | Contact Me Get Latest Price
Packaging Details: Iron Frame Package
Delivery Time: 50~100 Days
Payment Terms: Payment by T/T, Payment percentage can be negotiated according to actual situation.The balance against the receipt of the correct test certificates or as per customer’s suggestion.
Supply Ability:

300Ton/Tons per Month

 

Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

 

FAQ:

 

Q1: Which port is closest to your location?

A: Qingdao Port is closest to our factory, about 1 hour driving distance to our place.

 

Q2: How about your delivery time?

A: Generally, it will take 30-45 day after receiving your advance payemnt. The specific delivery time depends on the items and the quantity of your order.

 

Q3: Do you offer overseas installation service?

A: Yes, we can send engineers or welders to help installation at site.

Power Plant CFB Boiler Economizer Silver Boiler Spare Part For Petroleum Industry

 

Contact Information

ADD: No.1,Dong Li Road, Dong Lai, Zhangjiagang City, Jiangsu, China

Phone:+86 0512-56770166

E-mail: orl@orlpower.com

Website: http://www.orlpower.com

Contact Details
Suzhou orl power engineering co ., ltd

Contact Person: ORL

Send your inquiry directly to us (0 / 3000)