Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Suzhou orl power engineering co ., ltd
Home ProductsBoiler Water Wall

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification

China Suzhou orl power engineering co ., ltd certification
China Suzhou orl power engineering co ., ltd certification
It's really a great idea to make cooperation with you.

—— Vipin Bhardwaj

save money and time ,Excellent quality ,prefect service ,Enthusiastic and creative team.Great!

—— Yavorovich Nikolay

Unique creativity, a strong design team, new products, new surprises, every order can bring a lot of profit.

—— Ghaleb Jaber

I'm Online Chat Now

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification
Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification
video play

Large Image :  Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification

Product Details:
Place of Origin: Zhangjiagang,Jiangsu,China
Brand Name: ORL Power
Certification: ISO9001/SGS/TUV/ASME/EN
Model Number: Customization
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set/Sets 10tons
Price: Contact me | Get Latest Price
Packaging Details: Iron Frame Package
Delivery Time: 50~100 Days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 500Ton/Tons per Month
Detailed Product Description
Condition: New Type: Once Through、Natural Circulation
Usage: Industry、Power Station Structure: Fire、Water Tube
Pressure: High、Low Pressure Style: Style
Fuel: Coal、Gas、Oil-fired, Water Heat Output: Hot Water、Steam
Dimension(L*W*H): Customization Weight: 10~1000ton
Keywords: Boiler Water Wall Panel Application: Hot Water Boiler
High Light:

boiler water tube

,

boiler panel

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV CertificationSteel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 0

Description

A waterwall in a boiler is any furnace wall that is comprised of refractory and tubes in a water-tube boiler. The tubes are evenly spaced and generally connect to headers which in turn are connected back to the main generating bank of the boiler. They serve a two fold purpose here in that they capture heat that would otherwise escape to the atmosphere and help heat the water in the boiler. And they also help keep the refractory cool .This prevents spalling of the refractory.

Our membrane water wall are manufactured with high grade raw material and contemporary production equipment at our advanced production unit. Various sizes, shapes and specifications, will meet all the requirements of our clients . Further, cargoes are delivered to the clients within lead time.

Specifications

Name Membrane water panel
Material Carbon steel,Alloy steel,etc.
Tube size Φ38 - 76 mm, Customization
Standard ISO , ASME
Model Studded
Dimension Customization
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
Installation location around the boiler combustion chamber

 

 

 

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month Contact Me Get Latest Price

 

 

Company Information

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 1

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

 

Main Product 

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 2

 

Boiler Parts

 

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

 

 

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 3

Boiler Parts

 

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 

Production Workshop

 

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 4Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 5

Boiler Product Test

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

Testing Center

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 6

 

Packaging & Shipping

 

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 7

 

Certifications

 

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 8

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

 

Company Business

 

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 9

Our products have been wildly used in power plants and large international companies overseas.

 

 

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

 

Trading Process

 

Steel Water Heat Boiler Water Wall , Waterwalls High Temp TUV Certification 10

 

 

 

ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.

 

 

FAQ

 

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

 

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

 

Contact Information

  1. ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
  2. Phone:+86 0512-56770166
  3. E-mail: info@orlpower.com
  4. Website:http://www.orlpower.com

Contact Details
Suzhou orl power engineering co ., ltd

Contact Person: Mr Robin

Tel: +8618550138377

Send your inquiry directly to us (0 / 3000)