Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Suzhou orl power engineering co ., ltd
Home ProductsBoiler Water Wall

Power Plant Boiler Membrane Water Wall Alloy Steel With ISO Certification

China Suzhou orl power engineering co ., ltd certification
China Suzhou orl power engineering co ., ltd certification
It's really a great idea to make cooperation with you.

—— Vipin Bhardwaj

save money and time ,Excellent quality ,prefect service ,Enthusiastic and creative team.Great!

—— Yavorovich Nikolay

Unique creativity, a strong design team, new products, new surprises, every order can bring a lot of profit.

—— Ghaleb Jaber

I'm Online Chat Now

Power Plant Boiler Membrane Water Wall Alloy Steel With ISO Certification

Power Plant Boiler Membrane Water Wall Alloy Steel With ISO Certification
Power Plant Boiler Membrane Water Wall Alloy Steel With ISO Certification

Large Image :  Power Plant Boiler Membrane Water Wall Alloy Steel With ISO Certification

Product Details:
Place of Origin: Zhangjiagang,Jiangsu,China
Brand Name: ORL Power
Certification: ISO9001/SGS/TUV/ASME/EN
Model Number: Customization
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set/Sets 10tons
Price: Contact me | Get Latest Price
Packaging Details: Iron Frame Package
Delivery Time: 50~100 Days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 500Ton/Tons per Month
Detailed Product Description
Keywords: Boiler Plant Water Wall In Boiler Fuel: Coal/Gas/Oil-fired,Water Heat
Weight: 10~1000ton Type: Once Through、Natural Circulation
Structure: Fire、Water Tube After-sales Service Provided: Engineers Available To Service Machinery Overseas
Output: Hot Water、Steam Color: Customer's Requirement
High Light:

Boiler Membrane Water Wall

,

Alloy steel Boiler Water Wall

,

Power Plant Boiler Membrane Water Wall

Power Plant Boiler Membrane Water Wall With ISO Certification China Manufacturer

 

Advantages of Membrane Water Wall
1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.
2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.
3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.
4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.
5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.
6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload.

 

Specifications

Name Membrane water panel
Material Carbon steel,Alloy steel,etc.
Tube size Φ38 - 76 mm, Customization
Standard ISO , ASME
Model Studded
Dimension Customization
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
Installation location around the boiler combustion chamber

 

Company Information

Power Plant Boiler Membrane Water Wall Alloy Steel With ISO Certification 0

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

Packaging & Shipping

 

 

Power Plant Boiler Membrane Water Wall Alloy Steel With ISO Certification 1

 

 

Certifications

 

 

Power Plant Boiler Membrane Water Wall Alloy Steel With ISO Certification 2

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

 

FAQ

 

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

 

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

 

Contact Details
Suzhou orl power engineering co ., ltd

Contact Person: Mr Robin

Tel: +8618550138377

Send your inquiry directly to us (0 / 3000)