Suzhou orl power engineering co ., ltd
Home ProductsCFB Boiler Header

330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV

China Suzhou orl power engineering co ., ltd certification
China Suzhou orl power engineering co ., ltd certification
It's really a great idea to make cooperation with you.

—— Vipin Bhardwaj

save money and time ,Excellent quality ,prefect service ,Enthusiastic and creative team.Great!

—— Yavorovich Nikolay

Unique creativity, a strong design team, new products, new surprises, every order can bring a lot of profit.

—— Ghaleb Jaber

I'm Online Chat Now

330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV

330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV
330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV 330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV 330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV 330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV

Large Image :  330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV

Product Details:
Place of Origin: Zhangjiagang,Jiangsu,China
Brand Name: ORL Power
Certification: ISO9001/SGS/TUV/ASME/EN
Model Number: Customization
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set/Sets 10tons
Price: Contact me | Get Latest Price
Packaging Details: Iron Frame Package
Delivery Time: 50~100 Days
Payment Terms: T/T
Supply Ability: 100Ton/Tons per Month
Detailed Product Description
Packing: Iron Frame Package Model Number:: Customized
Usage: Industry, Power Station Structure: Fire/Water Tube
Pressure: High/Low Pressure Type: Boiler Parts
Fuel: Coal/Gas/Oil Output: Hot Water/Steam
Dimension(L*W*H): Customization Weight: 10~1000ton
Keywords: Boiler Water Header Application: Waste Heat Recovery Boiler
High Light:

boiler steam header

,

boiler header

 
 
330MW Capacity Station Power CFB Boiler / Water Factor Power Boiler Header TUV

 

Descriptions:

 

Boiler headers, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

Boiler header, also called sub-drum,widely used in power generation, petrochemicals, steel, cement, construction and other industries.

Specification:

1. Steam header body diameter: 6inch ,8inch,10inch,12inch,and so on

2. Branch pipe:1',2',3',4',5',6' and so on.

3. pressure:1.0mpa,1.25mpa,1.6mpa,2.0mpa,2.5mpa

4. material:pressure vessel carbon steel.

Kindly tell us the steam header body size and branch size and branch pipe numbers when you want to order this product. Thank you.

 

Technical Parameter:

 

Body Materials

Carbon Steel(20#,20G,SA192,A-1),Alloy Steel(15CrMoG,12Cr1MoVG,T11,T22)etc.

 

Type header body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts
Advantages advanced welding, safe and reliable operation
Working Pressure Depend on material
Standard China GB, ASME
Dimension Customization
Welding SMAW, SAW,GTAW (TIG)
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Drilling→Welding→RT, PT→ Inspection →Heat treatment →Hydraulic pressure test→Painting→Packaging
Remarks Customized order is also accepted.


 
 


Contact Information
ADD: No.11,East Renmin Road, Yang she Town,  Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: orl@orlpower.com
Website: www.boiler-units.com
 
 
Quick Detail:
Waste Heat Petrochemical Industry Recovery Boiler Header
• Alloy steel, carbon steel or as per customer’s requirements
• Good quality, good service, short delivery time
 
Description:
Waste Heat Petrochemical Industry Recovery Boiler Header can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.
The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.
 
Hot-rolled steel plate produce
1.Hot-rolled plate, hot-rolled steel plate. Complete raw materials after the formation of smelting steel ingot, through the press forming process of ingot steel rolling heating.
2.Width is larger than 600mm(≥600mm), thickness is 0.35-200mm.

 
 

 

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month Contact Me Get Latest Price

 
Production Highlights
The critical point to manufacture the end cover of steam trap boiler economizer header is the welding process. We adopt the advanced manufacture process, the complete large sized device and mature technology, especially the welding of the end cover with the boiler part header, we adopt the auto submerged welding, this welding method exists the high manufacture efficiency, good quality, the artistic welding appearance, safe and reliable operation.
 
 
Specification of boiler header
China industrial boiler pressure part header for CFB boiler is consisted of header body ( large diameter seamless steel tube), end cover (enclosure), tube joint, hand hole, thermometer socket and so on. And the welding checking is strictly proceeded in the welding process to guarantee 100% qualified products.
 
 
330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV 0
 
 
 
Boiler Parts
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 
 
FAQ

 
1. Why choose us?
We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.
We ensure the deliver time, high quality, and the best after-sale service for you.
2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.
330 MW Waste Heat Petrochemical Industry Recovery Boiler Water Header TUV 1

 

Contact Information

 

ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: info@orlpower.com
Website: www.boiler-units.com

Contact Details
Suzhou orl power engineering co ., ltd

Contact Person: Mr Robin

Tel: +8618550138377

Send your inquiry directly to us (0 / 3000)