Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Suzhou orl power engineering co ., ltd
Home ProductsBoiler Mud Drum

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized

China Suzhou orl power engineering co ., ltd certification
China Suzhou orl power engineering co ., ltd certification
It's really a great idea to make cooperation with you.

—— Vipin Bhardwaj

save money and time ,Excellent quality ,prefect service ,Enthusiastic and creative team.Great!

—— Yavorovich Nikolay

Unique creativity, a strong design team, new products, new surprises, every order can bring a lot of profit.

—— Ghaleb Jaber

I'm Online Chat Now

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized
Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized

Large Image :  Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized

Product Details:
Place of Origin: Zhangjiagang,Jiangsu,China
Brand Name: ORL Power
Certification: ISO9001/SGS/TUV/ASME/EN
Model Number: Customization
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set/Sets 10tons
Price: Contact me | Get Latest Price
Packaging Details: Iron Frame Package
Delivery Time: 50~100 Days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 100Ton/Tons per Month
Detailed Product Description
Condition: New Type: Natural Circulation/Once Through
Usage: Industry/Power Station Structure: Fire/Water Tube
Pressure: High/Low Pressure Style: Style
Fuel: Coal/Gas/Oil-fired, Water Heat Output: Hot Water/Steam
Dimension(L*W*H): Customization Weight: 10~1000ton
Product Name: Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output Keywords: Boiler Drum
High Light:

high pressure drum

,

Boiler Unit

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 0

 

Description

 

In the water tube boiler the upper drum (Boiler steam drum) provides for separation of steam from water. It also provides liquid holdup capacity (typically 10 to 60 seconds) to allow for a dynamic response to load changes without losing liquid in the downcomer and riser tubes. The size of the steam drum is determined by the volume required for a clean separation between steam and water to produce a dry saturated steam, it also provides an adequate amount of steam storage. The steam drum is also called the upper drum.

 

Product parameter

 

Product Name Boiler Steam Drum ( Steam Water Separator )
Applied Area Natural circulation boiler
Drum Shell Plate Material

- Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70

- Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353

Drum Head Material Same as shell
Nozzle Tube Material As per design
Standard China GB, ASME, EN
Manufacturer Grade China A Grade, ABS Certificated, TUV Certificated
Working Temperature Saturation Temperature at rated pressure
Working Pressure 1.6 MPa ~ 22.5 MPa

Shell Plate Thickness

(Drum Wall Thickness)

≤150 mm
Drum Diameter ≤3,200 mm
Drum Length ≤25,000 mm
Welding

- Shell : SMAW, SAW

- Nozzle tube : GTAW (TIG), SMAW

Welding NDT

- Shell longitudinal seam : 100% RT, 100% UT

- Shell circumferential seam : 100% RT, 15% UT

- Nozzle tube angle seam : 100% UT, 100% MT

 

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

Company Information

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 1

 

 

 

Product Description

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 2

 

 

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 3

Boiler Parts

 

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 

 

 

Production Workshop

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 4

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 5

 

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 6

 

Testing Center

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 7

Boiler Product Test

 

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

 

 

 

Packaging & Shipping

 

 

Coal Fired Boiler Mud Drum Boiler Equipment Hot Water Steam Output ORL Customized 8

 

 

Contact Details
Suzhou orl power engineering co ., ltd

Contact Person: ORL

Tel: +8618550138377

Send your inquiry directly to us (0 / 3000)